The switchboard decides what's possible — an ageing or full board needs addressing before an EV circuit is added.
What this topic covers
Assessing spare capacity
We check main switch rating and how the house actually uses power.
When an upgrade is required
Ceramic fuses, no RCDs or no spare ways mean an upgrade is required, not optional.
Load management as an alternative
Where capacity, not condition, is the issue, load management can remove the need entirely.
Protection devices
RCD and overcurrent protection are specified to suit the charger's own leakage detection.
Key facts
- A 7.4kW charger draws 32A continuously, similar to a large air conditioner.
- Supply upgrades involve Energex and can add lead time.
- Load management is usually cheaper than upgrading consumer mains.

Ready to install your EV charger?
Get a fixed-price quote from the Sunshine Coast's EV charging specialists.
- Fixed-price quotes
- Licensed Queensland electricians
- Installed to AS/NZS 3000
- Same-day quote turnaround