Learning Centre

Switchboards

Capacity, protection devices, upgrades and load management.

Switchboards — home EV charging on the Sunshine Coast

The switchboard decides what's possible — an ageing or full board needs addressing before an EV circuit is added.

What this topic covers

  • Assessing spare capacity

    We check main switch rating and how the house actually uses power.

  • When an upgrade is required

    Ceramic fuses, no RCDs or no spare ways mean an upgrade is required, not optional.

  • Load management as an alternative

    Where capacity, not condition, is the issue, load management can remove the need entirely.

  • Protection devices

    RCD and overcurrent protection are specified to suit the charger's own leakage detection.

Key facts

  • A 7.4kW charger draws 32A continuously, similar to a large air conditioner.
  • Supply upgrades involve Energex and can add lead time.
  • Load management is usually cheaper than upgrading consumer mains.
Electric car charging in the driveway of a contemporary Sunshine Coast home at dusk

Ready to install your EV charger?

Get a fixed-price quote from the Sunshine Coast's EV charging specialists.

  • Fixed-price quotes
  • Licensed Queensland electricians
  • Installed to AS/NZS 3000
  • Same-day quote turnaround
07 5328 3811